Exercise: Integral action produces zero steady state error*

From FBSwiki
Jump to: navigation, search

We say that an system with a constant input reaches ``steady state if the output of the system approaches a constant value as time increases. Show that a controller with integral action, such as those given by the equations

math

and

math

gives zero error if the closed loop system reaches steady state.