Objectives
Critical Objectives
- ✔ State logging (astate) [A4, A5]
- ✔ Steering, brake, throttle actuation drivers complete [A2, A3]
- ✔ Steering feedback (old (parker) actuator; SW OK) [A3]
- ✔ Interior and exterior design for Alice [A6] - The finalized specifications will be determined after the vehicle team meeting on Friday 1/28
- ✔ Sensor suite chosen - 24 Jan Project Meeting
- ✔ Bob: steering fixed [B1, B2]
|
Baseline Objectives
- ✗ Preliminary brake, throttle feedback (write/read drivers) [A2]
- ✔ RDDF path generation (bugs #897 ) and #898) [B1]
- ✔ Adrive with prototype skynet interface [A2, A3]
- ✔ Bob path following, on a pre-determined trajectory [B2] (steering only)
- ✔ MapDisplay showing vehicle location, orientation and path (MTA) (bug #1069) [B1, B2]
- ✔ Prototype skynet demonstration [A5]
- Preliminary gimbal specification/configuration [A6]
- ✔ NTP installed on race computers
- ✔ Video capture of all autonomous testing
|
Bonus Objectives
- ✔ Skynet file reader commanding adrive. Execute trajectory from file that commands actuators via adrive.
Student who is able to guess final location of Alice closest wins a free ipod [A5]
- ✔ SDS fully operational [A5]
-
Full position/force feedback on actuators [A2, A3] Removed - components not available
-
DARPA video of Bob [B2] Moved to baseline
</table>
|
Technical Challenges (blockers)
Veh: Interior and exterior design document(bug 1071)
Veh: Temporary GPS, IMU mounts (bug 1072)
Veh: Bob steering fixed (bug 1025)
Veh: brake calibration procedure (bug 1082)
Emb: Steering driver (write/read) (bug 970)
Emb: Brake and throttle drivers (write only) (bugs 717 and 996)
Emb: Need 3 serial ports in driving computer (SkyNET4?) (bug 1068)
✔ Pln: Path following controller (bug 1073) - (demonstrated steering-only)
Pln: Define calibration runs (bug 1076)
Ter: Astate working (bug 1027)
Ter: final sensor suite selection (+ documentation) (bug 1074)
|
Approach (timeline)
| Fri, 1/14 |
| establish test team [done]
| | Mon, 1/17 | 7:30p
| presentation of draft test plan at Project Meeting
| | Thu, 1/20 | 5:00p
| test team meeting (shop) - check on status
| | Fri, 1/21 | 5:00p
| go/no go meeting (all participants; shop)
- Checkout of adrive on Alice in shop (Cossel)
| | Sat-Sun, 1/22-23
| testing (see schedule below)
| | Sun, 1/23 | 6:00p
| test wrap up (all participants; shop)
| | | 7:00p
| [[test team wrap up meeting (shop)
</table>
</table>
Related Links
Test Schedule
Day 1: 22 Jan 05 (test manager: Ryan Farmer)
Goals
- Computer controlled operation and characterization of Alice
- System and software checkout on Bob (in preparation for Sunday testing)
| Time | Alice | Bob | Other
</tr>
| | 10:00a
| A0. Perform field test checklist (Hines)
|
Remain in shop for checkout and testing
- Wiki and bugzilla databases to remain at Caltech
- B0: Perform system checklist (Donovan)
- B1: RDDF path generation demonstration (Donovan)
- Pack up supplies
|
| | 11:00a
| Transfer IMU, GPS to Alice; drive to Santa Anita |
| | 12:00p
|
Adrive/Astate testing
- A1: Safety driver training: generate instructions for safe operations (Farmer)
- A2: Throttle/brake: speed up and slow down via computer command (Hines)
- A3: Steering: at 5 mph, command left/right motions (Rosen)
- A4: GPS/IMU: take data during all runs (Leibs)
- Test SDS to GPS interface when opportunity presents itself
|
| | 1:00p |
| | 2:00p
|
Calibration runs
- These need to be defined by planning team (bug 1076)
- A5: Execute desired sequences (via skynet file reader if possible) and log data from adrive and astate (Rosen)
|
| | 3:00p
|
| | 4:00p
| Return Alice to shop; transfer IMU, GPS back to Bob
- Leave equipment packed in boxes for quick departure on Sun
|
| | 5:00p | Team meeting in shop
</table>
Day 2: 23 Jan 05 (test manager: Haomiao Huang)
Goals
- Path following (Bob)
- Prepare Alice to be taken to Sportsmobile
| Time | Alice | Bob | Other
</tr>
| | 8:30a
|
Remain in Shop
- A6: Prepare for delivery to Sportsmobile (Cossel)
- Vehicle may be transported to Fresno on Sunday. Time? (Elliott)
| Load Bob onto trailer; transport to Santa Anita
|
| | 9:30a
| Set up field operations
|
| | 10:00a
|
Path following
- B2: Manual path following w/ data logging (Huang)
- B3: Path following on suite of RDDFs (Stewart)
- Laura Lindzey (PathFollowing)
- Jason Yosinksi (RDDF PathGeneration support)
- Additional people needed: Tow vehicle driver (Ben), bob driver (Laura?)
- Laura, Jason will help hitch up trailer
|
| | 11:00a |
| | 12:00p | Lunch: TBD
| | 1:00p |
| | 2:00p |
| | 3:00p
| Return to campus; unpack |
| | 4:00p | | |
| | 5:00p | Team meeting in shop
</table>
To Be Determined
- What equipment should we take with us on Saturday? Sunday?
- Should we start the tests early on Sunday, just in case we need more time
- Could start at 8:30, testing by 10, return by 3 (Alex S)
- When we Alice be taking to Fresno? By who?
Chacterization Plan
Guidelines:
- Keep every run a separate file for ease of data processing
- When possible, repeat brake/coast/throttle runs across the same line but going the other way so we can average out biases due to slope of ground
Drag Characterization
- Allow vehicle to coast to a stop when driving, repeat several times as possible
- Need to define initial speeds
Throttle Characterization
- From a stop (no brake applied) set throttle to a position (increment in .05 for low ranges, i.e. .05, .1, .15, .2, then .1 from .3 to 1) and record velocity
- Do lower runs first, higher throttle settings as time allows
- For lower throttle ranges, allow vehicle to attain a constant velocity before stopping run
- For higher velocities, go until you run out of room
Brake Characterization
- Similar to drag characterization, apply brakes
- Increment down from -1 (-1, -.9, -.8, etc), lower numbers (0 to -.5) can come later
Steering Characterization
- At different constant velocities (idle, 10 mph, 15 mph, 20 mph) set steering to a constant setting and record positions
- Level ground not quite as important for this test
Notes
Field Test Notes from 1/23/05
- Vehicle: Bug: Need more extension cables (some cables are bad and should be discarded)
-
Need to figure out how to start DNS on lawrencium - telinit 9, notes added to Sysadmin dhcpcd.
- Sysadmin: Bug: Install gtkglextmm on Lawrencium
- Sysadmin: Bug: Install gtkglextmm on Holmium
- Sysadmin: Bug: Install MATLAB on Lawrencium
- Sysadmin: Bug: Install MATLAB on titanium
- Don't know where Berkelium is!
-
Don't know where Lithium is! - Henry brought it.
-
Don't know where Chlorine is! - In Bob on top of generator.
-
In Mac OS X: Running PathFollower and SimVStateVDrive results in "accept: Too many open files" streaming from PathFollower (MTA issue) - won't fix
- Sysadmin: Constantly getting "YPBINDPROC_DOMAIN: Domain not bound" on Holmium (and other laptops?)
- Sysadmin: Upgrade mediawiki on Lawrencium? The pages aren't displaying properly, and it shows the old skin.
- GTKDisplay: change to center on vehicle position rather than center of map
- Air Conditioning on roof of Bob is not working.
- Sysadmin: Install ssh-keys for team on lawrencium
- Sysadmin: make svn passwords automatic from all fieldtest computers to lawrencium
Test Notes
- PID_PathFollower using Santa Anita Easy: 1150hrs
- PID_Controller/PathFollower using Santa Anita Easy: 1210 hrs
- Wrong path in path follower.
- PID_Controller/PathFollower using Santa Anita Easy: 1215 hrs
- Prop 0.7, Integral 0, Derivative 1
- Not vidotaped.
Note: the times may not be correct. Please reference video recording to confirm.
- PID_PathFollower using Santa Anita Easy 114207 hrs ?
- Prop 0.8, Integral 0, Derivative 1.5
- PID_PathFollower using Santa Anita Easy: 122423 hrs ?
- Prop 0.55, Integral 0, Derivative 1.2
- Logging interrupted by pedestrian
- PID_PathFollower using Santa Anita Easy: 123701 hrs ?
- Prop 0.55, Integral 0.5, Derivative 1.5
- PID_PathFollower using Standard Switchback 25 Santa Anita: 125809 hrs ?
- Prop 0.65, Integral 0.01, Derivative 1.2
- PID_PathFollower using Standard Switchback 50 Santa Anita: 133255 hrs
- Prop 0.65, Integral 0.01, Derivative 1.2
- PID_PathFollower using Standard Switchback 50 Santa Anita: 142540 hrs
- Prop 0.65, Integral 0.01, Derivative 1.2
- PID_PathFollower using Standard Switchback 50 Santa Anita: 143353 hrs
- Prop 0.65, Integral 0.01, Derivative 1.2
- PID_PathFollower using Standard Switchback 25 Santa Anita:
- Prop 0.65, Integral 0.01, Derivative 1.2
- Change maximum steering angle in PathFollwer.hh to pi/3 (from pi/6?)
- PID_PathFollower using Standard Switchback 25 Santa Anita: 145551
- Prop 0.65, Integral 0.01, Derivative 1.2
- PID_PathFollower using Standard Switchback 25 Santa Anita: 150133
- Prop 0.65, Integral 0.01, Derivative 1.2
|
|
|
|
|
|