Winter W3 Field Test

From DGC Wiki

Week 3 Field Test, 22-23 Jan 05

This page describes the goals and objectives for the Winter W3 Field Test, scheduled to take place on the weekend of 22-23 Jan 05.

GOTChA Schedule TBDs Notes Test Plan

</table>

Related meetings:

GOTChA Chart

Goals (from Winter Term Test Plan)

  • Computer controlled operation and characterization of Alice
  • Path following (Bob)
  • Alice ready to be taken to Sportsmobile

Test Team

</table>

Objectives

Critical Objectives

  • ✔ State logging (astate) [A4, A5]
  • ✔ Steering, brake, throttle actuation drivers complete [A2, A3]
  • ✔ Steering feedback (old (parker) actuator; SW OK) [A3]
  • ✔ Interior and exterior design for Alice [A6] - The finalized specifications will be determined after the vehicle team meeting on Friday 1/28
  • ✔ Sensor suite chosen - 24 Jan Project Meeting
  • ✔ Bob: steering fixed [B1, B2]

Baseline Objectives

  • ✗ Preliminary brake, throttle feedback (write/read drivers) [A2]
  • ✔ RDDF path generation (bugs #897 ) and #898) [B1]
  • ✔ Adrive with prototype skynet interface [A2, A3]
  • ✔ Bob path following, on a pre-determined trajectory [B2] (steering only)
  • ✔ MapDisplay showing vehicle location, orientation and path (MTA) (bug #1069) [B1, B2]
  • ✔ Prototype skynet demonstration [A5]
  • Preliminary gimbal specification/configuration [A6]
  • ✔ NTP installed on race computers
  • ✔ Video capture of all autonomous testing

Bonus Objectives

  • ✔ Skynet file reader commanding adrive. Execute trajectory from file that commands actuators via adrive. Student who is able to guess final location of Alice closest wins a free ipod [A5]
  • ✔ SDS fully operational [A5]
  • Full position/force feedback on actuators [A2, A3] Removed - components not available
  • DARPA video of Bob [B2] Moved to baseline

</table>

Technical Challenges (blockers)

Image:openbox.png Veh: Interior and exterior design document(bug 1071)
Image:check.png Veh: Temporary GPS, IMU mounts (bug 1072)
Image:check.png Veh: Bob steering fixed (bug 1025)
Image:cross.png Veh: brake calibration procedure (bug 1082)
Image:check.png Emb: Steering driver (write/read) (bug 970)
Image:check.png Emb: Brake and throttle drivers (write only) (bugs 717 and 996)
Image:check.png Emb: Need 3 serial ports in driving computer (SkyNET4?) (bug 1068)
✔ Pln: Path following controller (bug 1073) - (demonstrated steering-only)
Image:check.png Pln: Define calibration runs (bug 1076)
Image:check.png Ter: Astate working (bug 1027)
Image:openbox.png Ter: final sensor suite selection (+ documentation) (bug 1074)

Approach (timeline)

Fri, 1/14 establish test team [done]
Mon, 1/17 7:30p presentation of draft test plan at Project Meeting
Thu, 1/20 5:00p test team meeting (shop) - check on status
Fri, 1/21 5:00p go/no go meeting (all participants; shop)
  • Checkout of adrive on Alice in shop (Cossel)
Sat-Sun, 1/22-23 testing (see schedule below)
Sun, 1/23 6:00p test wrap up (all participants; shop)
7:00p [[test team wrap up meeting (shop)

</table> </table>

Related Links

Test Schedule

Day 1: 22 Jan 05 (test manager: Ryan Farmer)

Goals

  • Computer controlled operation and characterization of Alice
  • System and software checkout on Bob (in preparation for Sunday testing)
Time Alice Bob Other

</tr>

10:00a A0. Perform field test checklist (Hines)
Remain in shop for checkout and testing
  • Wiki and bugzilla databases to remain at Caltech
  • B0: Perform system checklist (Donovan)
  • B1: RDDF path generation demonstration (Donovan)
  • Pack up supplies
11:00a Transfer IMU, GPS to Alice; drive to Santa Anita
12:00p
Adrive/Astate testing
  • A1: Safety driver training: generate instructions for safe operations (Farmer)
  • A2: Throttle/brake: speed up and slow down via computer command (Hines)
  • A3: Steering: at 5 mph, command left/right motions (Rosen)
  • A4: GPS/IMU: take data during all runs (Leibs)
    • Test SDS to GPS interface when opportunity presents itself
1:00p
2:00p
Calibration runs
  • These need to be defined by planning team (bug 1076)
  • A5: Execute desired sequences (via skynet file reader if possible) and log data from adrive and astate (Rosen)
3:00p
4:00p Return Alice to shop; transfer IMU, GPS back to Bob
  • Leave equipment packed in boxes for quick departure on Sun
5:00p Team meeting in shop

</table>

Day 2: 23 Jan 05 (test manager: Haomiao Huang)

Goals

  • Path following (Bob)
  • Prepare Alice to be taken to Sportsmobile
Time Alice Bob Other

</tr>

8:30a
Remain in Shop
  • A6: Prepare for delivery to Sportsmobile (Cossel)
  • Vehicle may be transported to Fresno on Sunday. Time? (Elliott)
Load Bob onto trailer; transport to Santa Anita
  • Donovan to help
9:30a Set up field operations
10:00a
Path following
  • B2: Manual path following w/ data logging (Huang)
  • B3: Path following on suite of RDDFs (Stewart)
  • Laura Lindzey (PathFollowing)
  • Jason Yosinksi (RDDF PathGeneration support)
  • Additional people needed: Tow vehicle driver (Ben), bob driver (Laura?)
  • Laura, Jason will help hitch up trailer
11:00a
12:00p Lunch: TBD
1:00p
2:00p
3:00p Return to campus; unpack
4:00p
5:00p Team meeting in shop

</table>

To Be Determined

  1. What equipment should we take with us on Saturday? Sunday?
  2. Should we start the tests early on Sunday, just in case we need more time
    • Could start at 8:30, testing by 10, return by 3 (Alex S)
  3. When we Alice be taking to Fresno? By who?

Chacterization Plan

Guidelines:

  • Keep every run a separate file for ease of data processing
  • When possible, repeat brake/coast/throttle runs across the same line but going the other way so we can average out biases due to slope of ground

Drag Characterization

  • Allow vehicle to coast to a stop when driving, repeat several times as possible
  • Need to define initial speeds

Throttle Characterization

  • From a stop (no brake applied) set throttle to a position (increment in .05 for low ranges, i.e. .05, .1, .15, .2, then .1 from .3 to 1) and record velocity
  • Do lower runs first, higher throttle settings as time allows
  • For lower throttle ranges, allow vehicle to attain a constant velocity before stopping run
  • For higher velocities, go until you run out of room

Brake Characterization

  • Similar to drag characterization, apply brakes
  • Increment down from -1 (-1, -.9, -.8, etc), lower numbers (0 to -.5) can come later

Steering Characterization

  • At different constant velocities (idle, 10 mph, 15 mph, 20 mph) set steering to a constant setting and record positions
  • Level ground not quite as important for this test

Notes

Field Test Notes from 1/23/05

  1. Vehicle: Bug: Need more extension cables (some cables are bad and should be discarded)
  2. Need to figure out how to start DNS on lawrencium - telinit 9, notes added to Sysadmin dhcpcd.
  3. Sysadmin: Bug: Install gtkglextmm on Lawrencium
  4. Sysadmin: Bug: Install gtkglextmm on Holmium
  5. Sysadmin: Bug: Install MATLAB on Lawrencium
  6. Sysadmin: Bug: Install MATLAB on titanium
  7. Don't know where Berkelium is!
  8. Don't know where Lithium is! - Henry brought it.
  9. Don't know where Chlorine is! - In Bob on top of generator.
  10. In Mac OS X: Running PathFollower and SimVStateVDrive results in "accept: Too many open files" streaming from PathFollower (MTA issue) - won't fix
  11. Sysadmin: Constantly getting "YPBINDPROC_DOMAIN: Domain not bound" on Holmium (and other laptops?)
  12. Sysadmin: Upgrade mediawiki on Lawrencium? The pages aren't displaying properly, and it shows the old skin.
  13. GTKDisplay: change to center on vehicle position rather than center of map
  14. Air Conditioning on roof of Bob is not working.
  15. Sysadmin: Install ssh-keys for team on lawrencium
  16. Sysadmin: make svn passwords automatic from all fieldtest computers to lawrencium

Test Notes

  1. PID_PathFollower using Santa Anita Easy: 1150hrs
  2. PID_Controller/PathFollower using Santa Anita Easy: 1210 hrs
    1. Wrong path in path follower.
  3. PID_Controller/PathFollower using Santa Anita Easy: 1215 hrs
    1. Prop 0.7, Integral 0, Derivative 1
    2. Not vidotaped.

Note: the times may not be correct. Please reference video recording to confirm.

  1. PID_PathFollower using Santa Anita Easy 114207 hrs ?
    1. Prop 0.8, Integral 0, Derivative 1.5
  2. PID_PathFollower using Santa Anita Easy: 122423 hrs ?
    1. Prop 0.55, Integral 0, Derivative 1.2
    2. Logging interrupted by pedestrian
  3. PID_PathFollower using Santa Anita Easy: 123701 hrs ?
    1. Prop 0.55, Integral 0.5, Derivative 1.5
  4. PID_PathFollower using Standard Switchback 25 Santa Anita: 125809 hrs ?
    1. Prop 0.65, Integral 0.01, Derivative 1.2
  1. PID_PathFollower using Standard Switchback 50 Santa Anita: 133255 hrs
    1. Prop 0.65, Integral 0.01, Derivative 1.2
  2. PID_PathFollower using Standard Switchback 50 Santa Anita: 142540 hrs
    1. Prop 0.65, Integral 0.01, Derivative 1.2
  3. PID_PathFollower using Standard Switchback 50 Santa Anita: 143353 hrs
    1. Prop 0.65, Integral 0.01, Derivative 1.2
  1. PID_PathFollower using Standard Switchback 25 Santa Anita:
    1. Prop 0.65, Integral 0.01, Derivative 1.2
    2. Change maximum steering angle in PathFollwer.hh to pi/3 (from pi/6?)
  2. PID_PathFollower using Standard Switchback 25 Santa Anita: 145551
    1. Prop 0.65, Integral 0.01, Derivative 1.2
  3. PID_PathFollower using Standard Switchback 25 Santa Anita: 150133
    1. Prop 0.65, Integral 0.01, Derivative 1.2

Retrieved from "http://kincora.cds.caltech.edu../../../w/i/n/Winter_W3_Field_Test_69ae.html"

This page has been accessed 581 times. This page was last modified 06:13, 5 February 2005 by Richard Murray. Based on work by Henry Barnor and DGC Wiki user(s) Jason, Cosselk, Lars, Pickett, Haomiao, Astewart, Jlamb, Joseph, Ryan, Jleibs, Hines and Drosen.


[Main Page]
Main Page
Alice Docs
DGC07
DGC05
Categories
Recent changes
Help

Edit this page
Discuss this page
Page history
What links here
Related changes

Special pages
Bug reports