Summer W4 Field Test
From DGC Wiki
This is a one day test that will occur on 8 Jul 05 at St Lukes. The test manager is Alex Stewart.
GOTChA Chart
|
Goals [Test Plan | Spirals | Edit]
- ✔ W1 Goal - Conduct tests with new members driving short RDDF, Site Visit equivilant
- ✔ W1 Goal - Bring new team members up to speed on field test operations
- ✔ Assign all spiral 4.1 objectives and tasks to individuals or subteams (via team GOTChA's and/or test plan)
- ✔ [W10] Make decisions on open discussion affecting 4.1 and 4.2 work:
- Complete all "define/design/decide" bugs
- Decide on final sensor driver interfaces (and begin implementation)
- Reduce number of unassigned bugs to less than 10% of open bugs
- RMM: Some decisions have been made, but a few key decisions (eg, SDS vs serial, safe testing procedures) and several design decisions (eg, SuperCon, whiskers) remain open. We need to work to close these out ASAP.
- ✔ [W9]
Complete all veh/emb "Alice out of commission" bugs Repair and upgrade Alice to fully operational condition for multi-day desert testing
- RMM: A/C and power are still issues, but not blockers for current testing.
- ✔
Begin work on GUI Develop unified operator interface
- Module status/start/logging interface tab that spawns new tabs when modules are started
- Define and implement API for module tab interface in GUI, including static and dynamic text, text boxes, control buttons and ability to modify module parameters
|
Test Team
Group 1
- Safety Passsenger (Group Lead): Dave Rosen
- Lyudmil Antnov
- Laura Fishman
- Erik Johannesson
Group 2
- Safety Passsenger (Group Lead): Jason Yosinski
- Tony Kelman
- Gustav Lindstrom
- Tami Reyda
Group 3
- Safety Passsenger (Group Lead): Laura Lindzey
- Lisa Nystrom
- Lusann Yang
- Marie Gorannnsson
|
Objectives
Critical [Test Plan | GOTChA | edit ]
- ✔ (All) Assign all team-level Spiral 4.1 objectives to individuals or subteams
- ✔ [W7] (V/E) Analysis of replacement time for all hardware; spare parts ordered
- ✔ (V/E) Decide on whether or not to use serial or SDS [bug #1907]
- Parallel paths: SDS on order, will try micro serial-to-ethernet, direct serial ports
- ⌛ (Pln) Define all supercon interfaces (to planning, terrain, veh/emb), and verify all other planning interfaces
- ✔ (Pln) Finalize logging/playback unified interface (timber through gui and command line)
- ✔ (Ter) Verify high speed LADAR operation (from W1)
- ✔ [W9] (Ter) Define and document final sensor configuration
- Stereo is defined; waiting on Larry
- LADARs in place; just need to locate. First cut mounts may not have the level of accuracy we need, but could be OK>
- Gimbals: we will have 2; should be able handle long range stereo pair
- ✔ [W9] (Ter) Define and document final module configuration
-
Learning module is still open (Cady) (eliminated after PIR)
- RMM: The only open issue is the gimbal
- ✔ (Ter) Investigate and decide if sim env is useful
- ✔ [W6] (Sys) Evaluate current wireless bridge solution & possible improvements - [bug #1681] (shift out to W6)
- RMM: we may need to use this from the suburban
- ✔ (IPT) Decide on ownership of overlapping modules
- ✔ process management (
V/E vs pln)
- ✔ learning (
pln vs ter)
- ✔ gimbal pointing (
pln vs ter vs V/E)
- ✔ skynet (pln
vs V/E)
| Baseline [Test Plan | GOTChA | edit ]
- ✔ (V/E) Complete OBD II installation/testing
-
(V/E) Convert sparrow to GTK [bug #1952] (moved to W5 critical [Ter])
- ✔ (V/E) First cut mounting of all available sensors: Reigl, new SICKs, cameras
- Reigl is the only thing missing; basically done
- ✔ (V/E) Create wiki page to document methods to meet 12-hour catastrophic recovery spec
- ✔ [W8] (Pln) Complete all
non-interface-related planning define/design/decide objectives
- ⌛ (Pln, Ter) Determine what will and will not be covered by SuperCon
- ✔ (Ter) Sensor drivers cleaned up and interfaces defined
- Only missing part is common interface for Rasmussen
- ✔ (Ter) Determine precise cause of catastrophic astate failures
- ✔ (IPT) Decide on progress tracking metrics [bug #1948]</font>
- RMM: Tracking miles, speed, blockers, unassigned bugs for now, and test matrix. Miles/speed and bug reports are on front page.
- ✗ (IPT) Reduce number of unassigned (major/critical/blocker) bugs to less than 10% of total open bugs at severity level at or above major
- Reduced unassigned to ~50 (16% of total) from 200+. Will keep working on this next week
- RMM: We don't seem to be able to maintain this level; typical is closer to 20%
</table>
|
Technical Challenges (Blockers)
-
RMM: changing this title means that the blockers link at the top doesn't work
- RMM: I suggest that we only list blockers for the *test* here. Things like increased computer ventilation are probably OK for the W4 test (although they are still an objective for W4 generally)
- V/E: list bug here, with link
- Planning:
[bug #1256] - Implement logging using Timber in all modules - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5 </s>
- <s>[bug #1472] - Prep modules for logging using Timber - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
[bug #1879] - trajFollower has dependency problems
- [bug #1932] - Investigate Skynet new archtecture approaches
- Terrain:
[bug #1561] - astate needs accurate elevation estimate - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
[bug #1832] - Change default bugzilla assignments - ADS: required in order to organise development to prep for W4
- [bug #793] - Get Sick Ladar units running at full 500kbaud data rate - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
- [bug #1846] - IMU latches onto corrupt values until IMU rebooted
- [bug #1794] - Integrate CTimberClient into Astate - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
- Other Teams:
- [bug #1639] - Install high speed SDS drivers on race computers
Technical Challenges for W4 Demonstration Test (in addition to previous)
-
Currently no test-time on Friday is allocated to testing newly developed tools - either compress timetable or hold another test if test time on Alice is required (Vs time on Jennifer)
- RMM: The W5 and W6 tests are dedicated to testing testing new tools. I don't think we need to do this in W4
- ADS: Agreed - updated
- Decide on vehicles and rides to St Lukes
- Define test-roles within Alice for each run - who runs what
- Make sure we have food for the team
-
Check Tony's availability
- RMM: we might schedule tests so that they run between meals. Eg, do everything on Fri morning or Fri afternoon (one or the other)
- ADS: Updated test-plan so that groups are shuttled back and forth between Caltech & St Lukes as their slots start/finish - this reduces lunch to two teams
- ADS: Checked with Tony & Sandie on Tuesday - they are going to prepare Lunch at St Lukes for ~12
|
Approach (timeline)
| 07/05 (Tue)
| 11a
| Project meeting presentation - Completed
|
| 07/07 (Thu)
| 8p
| Test team go/no go meeting
|
</table>
Test Schedule
Pre-Demonstration Test - Thursday 7th July 9pm @ St Lukes
- Run autonomously for 1.5-2 hours at St Lukes (Oval course) and monitor SDS performance - [bug #1907]
- Test Skynet-Spread in the field on Alice prior to the W4 Demonstration test
- Decide on whether to use Skynet/Skynet-Spread (as primary) for W4 Demonstration test on Friday based on results
- Test Team:
- Dave Rosen
- Alex Stewart
-
Tully Foote - Tully is not back until the 9th July
- Jeff Lamb
- Jeremy Gillula
Built on previous W1 test schedule that was delayed due to W1 crash
Prior to Departure
- Decide on vehicles and drivers for the test - Alice,
Harvey, Tosin Scotty + Cars as necessary
- RMM: we should decide if we really want to take Harvey. It's useful for field ops, but a lot of work with questionable benefit for this week.
- ADS: Updated based on disucssions in IPT meeting - Scotty will be available
- ADS: George can drive Scotty and has agreed to drive the Shuttle to/from Tech
- Make arrangments to use the test area and facilities - Contact Caltech security on Thursday evening & Friday morning prior to departure to confirm
- Decide on how meals will be handled and assign people to take care of food
- Go through checklists - George Hines
- RMM: this one is really important and might be a blocker. We should not leave the shop without updated checklists for the various activities we will undertake (including leaving the shop!)
- ADS: George Hines is the key check-list person and will be responsible for the equipment checkout
Test Day: 8 Jul 05
| Test | Activity |
|
| 7:30a | Group 1 Meet in Shop & Load-up remaining equipment |
|
| 8:00a | Group 1 Depart for St Lukes |
|
| 8:15a
|
- Arrive at St Lukes and set-up
|
|
| 8:45a
|
Test Description
A1: Site-Visit re-run Demo to New Team Members - Group 1
- Set-up RDDF for Mock site-visit using gpsAutoCap utility - Site Visit Checklist
- Run mock site-visit course (+ obstacles) autonomously - 5 runs
- Cycle all group members through all roles
- Group 2 - Leave Caltech for St Lukes
|
|
| 11.00a
|
Buffer time
|
|
| 12:00p | Lunch | Helpers: name1, name2
|
| 1:00p
|
- Group 1 - Depart for Tech
Test Description
A2: Site-Visit re-run Demo to New Team Members - Group 2
- Set-up RDDF for Mock site-visit using gpsAutoCap utility - Site Visit Checklist
- Run mock site-visit course (+ obstacles) autonomously - 5 runs
- Cycle all group members through all roles
- Group 3 - Leave Caltech for St Lukes
|
|
| 3:00p
|
Test Description
A3: Site-Visit re-run Demo to New Team Members - Group 3
- Set-up RDDF for Mock site-visit using gpsAutoCap utility - Site Visit Checklist
- Run mock site-visit course (+ obstacles) autonomously - 5 runs
- Cycle all group members through all roles
- Group 2 - Depart for Tech
|
|
| 5:00p
|
- Groups 3 Pack-up equipment
|
|
| 5:30p | Return to Caltech |
|
| 6:00p | Unpack + end of test meeting - ALL groups |
|
== Additional Information == |
|