This is a one day test that will occur on 8 Jul 05 at St Lukes. The test manager is Alex Stewart.

GOTChA Chart

Goals
[Test Plan | Spirals | Edit]

  1. ✔ W1 Goal - Conduct tests with new members driving short RDDF, Site Visit equivilant
  2. ✔ W1 Goal - Bring new team members up to speed on field test operations
  3. ✔ Assign all spiral 4.1 objectives and tasks to individuals or subteams (via team GOTChA's and/or test plan)
  4. ✔ [W10] Make decisions on open discussion affecting 4.1 and 4.2 work:
    • Complete all "define/design/decide" bugs
    • Decide on final sensor driver interfaces (and begin implementation)
    • Reduce number of unassigned bugs to less than 10% of open bugs
    • RMM: Some decisions have been made, but a few key decisions (eg, SDS vs serial, safe testing procedures) and several design decisions (eg, SuperCon, whiskers) remain open. We need to work to close these out ASAP.
  5. ✔ [W9] Complete all veh/emb "Alice out of commission" bugs Repair and upgrade Alice to fully operational condition for multi-day desert testing
    • RMM: A/C and power are still issues, but not blockers for current testing.
  6. ✔ Begin work on GUI Develop unified operator interface
    • Module status/start/logging interface tab that spawns new tabs when modules are started
    • Define and implement API for module tab interface in GUI, including static and dynamic text, text boxes, control buttons and ability to modify module parameters
Test Team


Group 1

  • Safety Passsenger (Group Lead): Dave Rosen
  • Lyudmil Antnov
  • Laura Fishman
  • Erik Johannesson

Group 2

  • Safety Passsenger (Group Lead): Jason Yosinski
  • Tony Kelman
  • Gustav Lindstrom
  • Tami Reyda

Group 3

  • Safety Passsenger (Group Lead): Laura Lindzey
  • Lisa Nystrom
  • Lusann Yang
  • Marie Gorannnsson



Objectives

Critical
[Test Plan | GOTChA | edit ]
  1. ✔ (All) Assign all team-level Spiral 4.1 objectives to individuals or subteams
  2. ✔ [W7] (V/E) Analysis of replacement time for all hardware; spare parts ordered
  3. ✔ (V/E) Decide on whether or not to use serial or SDS [bug #1907]
    • Parallel paths: SDS on order, will try micro serial-to-ethernet, direct serial ports
  4. ⌛ (Pln) Define all supercon interfaces (to planning, terrain, veh/emb), and verify all other planning interfaces
  5. ✔ (Pln) Finalize logging/playback unified interface (timber through gui and command line)
  6. ✔ (Ter) Verify high speed LADAR operation (from W1)
  7. ✔ [W9] (Ter) Define and document final sensor configuration
    • Stereo is defined; waiting on Larry
    • LADARs in place; just need to locate. First cut mounts may not have the level of accuracy we need, but could be OK>
    • Gimbals: we will have 2; should be able handle long range stereo pair
  8. ✔ [W9] (Ter) Define and document final module configuration
    • Learning module is still open (Cady) (eliminated after PIR)
    • RMM: The only open issue is the gimbal
  9. ✔ (Ter) Investigate and decide if sim env is useful
  10. ✔ [W6] (Sys) Evaluate current wireless bridge solution & possible improvements - [bug #1681] (shift out to W6)
    • RMM: we may need to use this from the suburban
  11. ✔ (IPT) Decide on ownership of overlapping modules
    • ✔ process management (V/E vs pln)
    • ✔ learning (pln vs ter)
    • ✔ gimbal pointing (pln vs ter vs V/E)
    • ✔ skynet (pln vs V/E)
Baseline
[Test Plan | GOTChA | edit ]
  1. ✔ (V/E) Complete OBD II installation/testing
  2. (V/E) Convert sparrow to GTK [bug #1952] (moved to W5 critical [Ter])
  3. ✔ (V/E) First cut mounting of all available sensors: Reigl, new SICKs, cameras
    • Reigl is the only thing missing; basically done
  4. ✔ (V/E) Create wiki page to document methods to meet 12-hour catastrophic recovery spec
  5. ✔ [W8] (Pln) Complete all non-interface-related planning define/design/decide objectives
  6. ⌛ (Pln, Ter) Determine what will and will not be covered by SuperCon
  7. ✔ (Ter) Sensor drivers cleaned up and interfaces defined
    • Only missing part is common interface for Rasmussen
  8. ✔ (Ter) Determine precise cause of catastrophic astate failures
  9. ✔ (IPT) Decide on progress tracking metrics [bug #1948]</font>
    • RMM: Tracking miles, speed, blockers, unassigned bugs for now, and test matrix. Miles/speed and bug reports are on front page.
  10. ✗ (IPT) Reduce number of unassigned (major/critical/blocker) bugs to less than 10% of total open bugs at severity level at or above major
    • Reduced unassigned to ~50 (16% of total) from 200+. Will keep working on this next week
    • RMM: We don't seem to be able to maintain this level; typical is closer to 20%

</table>

Technical Challenges (Blockers)

  • RMM: changing this title means that the blockers link at the top doesn't work
    • ADS: Fixed
  • RMM: I suggest that we only list blockers for the *test* here. Things like increased computer ventilation are probably OK for the W4 test (although they are still an objective for W4 generally)
    • ADS: Fixed
  • V/E: list bug here, with link
  • Planning:
    • [bug #1256] - Implement logging using Timber in all modules - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5 </s>
    • <s>[bug #1472] - Prep modules for logging using Timber - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
    • [bug #1879] - trajFollower has dependency problems
    • [bug #1932] - Investigate Skynet new archtecture approaches


  • Terrain:
    • [bug #1561] - astate needs accurate elevation estimate - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
    • [bug #1832] - Change default bugzilla assignments - ADS: required in order to organise development to prep for W4
    • [bug #793] - Get Sick Ladar units running at full 500kbaud data rate - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
    • [bug #1846] - IMU latches onto corrupt values until IMU rebooted
    • [bug #1794] - Integrate CTimberClient into Astate - ADS: Not really a blocker for the demonstration test, but a useful goal wrt W5
  • Other Teams:
    • [bug #1639] - Install high speed SDS drivers on race computers

Technical Challenges for W4 Demonstration Test (in addition to previous)

  • Currently no test-time on Friday is allocated to testing newly developed tools - either compress timetable or hold another test if test time on Alice is required (Vs time on Jennifer)
    • RMM: The W5 and W6 tests are dedicated to testing testing new tools. I don't think we need to do this in W4
    • ADS: Agreed - updated
  • Decide on vehicles and rides to St Lukes
  • Define test-roles within Alice for each run - who runs what
  • Make sure we have food for the team
    • Check Tony's availability
    • RMM: we might schedule tests so that they run between meals. Eg, do everything on Fri morning or Fri afternoon (one or the other)
    • ADS: Updated test-plan so that groups are shuttled back and forth between Caltech & St Lukes as their slots start/finish - this reduces lunch to two teams
    • ADS: Checked with Tony & Sandie on Tuesday - they are going to prepare Lunch at St Lukes for ~12

Approach (timeline)

07/05 (Tue)   11a   Project meeting presentation - Completed
07/07 (Thu)   8p   Test team go/no go meeting

</table>

Test Schedule

Pre-Demonstration Test - Thursday 7th July 9pm @ St Lukes

  • Run autonomously for 1.5-2 hours at St Lukes (Oval course) and monitor SDS performance - [bug #1907]
  • Test Skynet-Spread in the field on Alice prior to the W4 Demonstration test
    • Decide on whether to use Skynet/Skynet-Spread (as primary) for W4 Demonstration test on Friday based on results
  • Test Team:
    • Dave Rosen
    • Alex Stewart
    • Tully Foote - Tully is not back until the 9th July
    • Jeff Lamb
    • Jeremy Gillula



Built on previous W1 test schedule that was delayed due to W1 crash

Prior to Departure

  • Decide on vehicles and drivers for the test - Alice, Harvey, Tosin Scotty + Cars as necessary
    • RMM: we should decide if we really want to take Harvey. It's useful for field ops, but a lot of work with questionable benefit for this week.
    • ADS: Updated based on disucssions in IPT meeting - Scotty will be available
    • ADS: George can drive Scotty and has agreed to drive the Shuttle to/from Tech
  • Make arrangments to use the test area and facilities - Contact Caltech security on Thursday evening & Friday morning prior to departure to confirm
  • Decide on how meals will be handled and assign people to take care of food
  • Go through checklists - George Hines
    • RMM: this one is really important and might be a blocker. We should not leave the shop without updated checklists for the various activities we will undertake (including leaving the shop!)
    • ADS: George Hines is the key check-list person and will be responsible for the equipment checkout

Test Day: 8 Jul 05

Test   Activity
7:30a   Group 1 Meet in Shop & Load-up remaining equipment
8:00a   Group 1 Depart for St Lukes
8:15a  
  • Arrive at St Lukes and set-up
8:45a  
Test Description

A1: Site-Visit re-run Demo to New Team Members - Group 1

  • Set-up RDDF for Mock site-visit using gpsAutoCap utility - Site Visit Checklist
    • RDDF speed-limit = 10mph
  • Run mock site-visit course (+ obstacles) autonomously - 5 runs
  • Cycle all group members through all roles
  • Group 2 - Leave Caltech for St Lukes
  • Notes on Test
11.00a  

Buffer time

12:00p   Lunch Helpers: name1, name2
1:00p  
  • Group 1 - Depart for Tech
Test Description

A2: Site-Visit re-run Demo to New Team Members - Group 2

  • Set-up RDDF for Mock site-visit using gpsAutoCap utility - Site Visit Checklist
    • RDDF speed-limit = 10mph
  • Run mock site-visit course (+ obstacles) autonomously - 5 runs
  • Cycle all group members through all roles
  • Group 3 - Leave Caltech for St Lukes
3:00p  
Test Description

A3: Site-Visit re-run Demo to New Team Members - Group 3

  • Set-up RDDF for Mock site-visit using gpsAutoCap utility - Site Visit Checklist
    • RDDF speed-limit = 10mph
  • Run mock site-visit course (+ obstacles) autonomously - 5 runs
  • Cycle all group members through all roles
  • Group 2 - Depart for Tech
5:00p  
  • Groups 3 Pack-up equipment
5:30p   Return to Caltech
6:00p   Unpack + end of test meeting - ALL groups
== Additional Information ==

Retrieved from "http://kincora.cds.caltech.edu../../../s/u/m/Summer_W4_Field_Test_194f.html"

This page has been accessed 302 times. This page was last modified 09:09, 8 July 2005 by DGC Wiki user Astewart. Based on work by Richard Murray.


[Main Page]
Main Page
Alice Docs
DGC07
DGC05
Categories
Recent changes
Help

Edit this page
Discuss this page
Page history
What links here
Related changes

Special pages
Bug reports