GOTChA Chart
Goals
- x 10 minute run from cold start
- P Obstacle avoidance using LADAR, stereo at low speed
- x Efficient calibration, data logging, and operations
- ✗ Complete Stoddard Wells loop with sensor-based obstacle avoidance through deliberative planning.
|
Prep
|
Day 1
|
Day 2
</table>
|
- Cable (pln, doc)
- Cady (ter, tst)
- Cremean (IPT)
- Duncklee (ter, bld)
- Fisher (veh/emb, ops)
|
- Grogan (veh/emb, ops)
- Kogan (pln)
- Murray (IPT)
- Somers (veh/emb, sys)
- Wetzel (pln, mod)
| |
</table>
|
Objectives
Critical:
- ✔ Demonstrate functionality for remote starting and stopping of modules (B1)
- P Simulate spring field test operation using automated module startup (on small RDDF) (S1)
- P Develop specifications for unified data logging and playback (A0)
- x Define process for stable branch checkin/checkout (C0)
- P Figure out solution for long-range radio (B0)
|
Baseline:
- x
Mock site visit; trash can Obstacle avoidance at 10 mph with 10 minute setup (repeated 10 times) (B1)
- ✔ Gazebo simulation prior to departure (S1)
- x Develop efficient calibration procedures: ≤30 minutes for each of LADAR, stereo intrinsic, stereo extrinsic (A1)
- P Enable playback/unified data logging of raw data (A0)
- x E-stop demonstration (w/ safety driver) (B1)
- Electronic signalling of pause/run/disable
- Software-based pause using skynet message
-
Warning lights and tone installed and operational (to be moved to W6)
- ✔ Install front seat harnesses (done by Ken et. al)
- P Finalize specifications for DBS and reactive planner (B2)
- ✗ Two (2) minute turnaround from failure of one part of test to continuation of test. (A2)
- Identification and documentation of failure mode and conditions.
- Isolation of logs for that part of test.
- Back in autonomous mode within two minutes.
|
Bonus
- P Test reactive planner implementation in place of deliberative planner (B2)
- x Stereovision obstacle avoidance (A2)
- x
Test integrated reactive and deliberative planner with mode management (B2) (not until each have been sufficiently tested)
-
At least one run without safety driver (A2, B2) (not until Estop sufficiently tested)
</table>
|
Technical Challenges (blockers)
- Get FusionMapper and Planner working together across UDP (Dima)
- Get LadarFeeder and FusionMapper working together in Gazebo (Chris W)
- Get ModuleStart working and demonstrated on Alice/Gazebo (Henry)
- Get Logger working in at least a few modules (Henry)
- Checklists for Alice operations (Laura)
-
Design specific tests and assign test team owners for them (W3 test) (done)
-
Assign operation teams for tests ASAP (W3 test) (done)
-
Determine if DARPA will allow safety driver in site visit (IPT) (yes)
-
Implement "failsafe" E-stop operation (IPT) (move to W6)
-
Pick color of trashcans for site visit (Terrain) (done by E Cady)
-
Look into time of day and sun location issues for site visit (Terrain) (move to W6)
- Grow obstacles and RDDF in cost map (Terrain) (done in path evaluation for W3, need to test)
- Executables installed to one location (Build, bug #1414)
- Remote module starting/stopping (Planning, bug #1368, bug #1430)
- Implementation of unified logging (Planning, bug #1256)
-
Fix front hub and differential (Vehicle, bug #1420, bug #1421)
- Develop and document new calibration procedure (Terrain, bug #1259)
- Check the links below for more!
Bugzilla blockers for Spring W3 field test]
|
Approach (timeline)
| Mo 4/4 | 12:00p
| Test team meeting to agree on goals and objectives
| | Tu 4/5 | 12:00p
| Review test goals at project meeting
| | Mo 4/11 | 7:00p
| Test team meeting to review and modify plan
| | Tu 4/12 | 12:00p
| Test team presentation at project meeting (objectives, schedule, blockers)
| | We 4/13 | 7:00p
| Test team meeting (shop) - check on status
| | Th 4/14 | 5:00p
| Test status meeting - go over test status; determine actions + time of go/no-go meeting
| | Sa 4/16 | 7:00a
| Go/no-go meeting - verify ready to go
| | Sa 4/16 |
| Test day #1
-
Setup base camp, operations
-
Demonstrate critical and baseline objectives
- Debugging in shop
- End of day meeting @
76:30 pm (in field)
|
| Su 4/17 | 7:00a
| Go/no-go meeting - verify ready to go
| | Su 4/17 |
| Test day #2
- Demonstrate critical and baseline
and bonus objectives
- Return to
PasadenaCaltech by ~8 pm
| | Su 4/17 | 8:00p
| Test review (all test participants; restaurant)
</table>
</table>
Test Schedule
Prior to Go/No-Go Meeting
For checkout purposes, last stable build: <insert revision # here> (Duncklee)
|
|
- Equipment preparation (Cady)
- List any unusual items that need to be taken
- S1: Simulation of all tests on Gazebo (Wetzel)
|
|
Top
GOTChA
Prep
Day 1
Day 2
</table>
</table>
Specific tests to run before leaving shop
- A0: Data logging and playback specs (Somers)
-
B0: Long range radio testing (Grogan)
- C0: Subversion stable branch process setup (Duncklee)
- A1: Calibration
Process (Duncklee)
-
Demonstrate ability to efficienly calibrate stereo, LADAR
Day 1
- Test Attendance Saturday: Lars, Ryan C., Chris, Jason, Alex, Rob, Ken, Tony, Jeff, Eric, Laura
Goals
- Establish initial operations
- Complete critical objectives
|
Test Manager: Murray
- Run all meetings (go/no go)
- Maintain (and realign) schedule
- Supervise filming
|
- Team member marked in bold is the task leader
- Team member marked in italics is the default notetaker
</table>
|
|
Top
GOTChA
Prep
Day 1
Day 2
</table>
</table>
| Time | Track 1 | Track 2 | Operations
|
| 7:00a |
- Go through pre-conditions and make sure we are ready to leave
|
- Transfer databases to lawrencium (Owner)
|
| 8:00a
|
Drive to test area
- Alice (4): Grogan, passengers
- Tow vehicle (2): Driver, passengers
-
Suburban (5): Driver, passengers
- Harvey (6): Driver, passengers [leaves 30 minutes early]
|
- Additional cars:
- Directions to [[<Name> Test Area]]
</table>
</s>
|
| 9:00a
|
B1: Efficient Operations #1 (Cady)
- Demonstrate ability to initiate test from cold start
- Time all operations; multiple attempts to improve times
- Sample task: trashcan avoidance
- Show working remote e-stop
- Modules: list of all modules needed for test
- Team (4): Jason, Chris, Ben, Eric
- Additional comments, notes
- Subversion branches for field testing
|
|
C0: Set up operations area (Grogan)
- Set up RVs, tables, networking, power
- Team (6): Owner, team members
|
| 11:00am
|
|
LadarFeeder/FusionMapper (Grogan)
- making sure ladar accurately fills in map
- Team (4): Dima, Kevin, Rob, Ryan
- Additional comments, notes: Grogan is not knowledgable in this test, but can coordinate those who are
|
Lunch
Helpers (2): helper1, helper2
|
| 1:00p
|
Deliberative planner (A3, D Kogan)
- ModuleStarter capability from B1 continued
- Set up and commit new RDDFs
- Set up trash cans for obstacle avoidance
- Deliberative planning at 10mph around trash cans
- Modules: adrive, astate, TrajFollower, LadarFeeder, FusionMapper, PlannerModule
- Team (4): Dima, Eric, Ken, Alex
- Additional comments, notes
|
- Transfer and document logs
|
C1: Auxilliary Activities
- Make use of other vehicles, as needed
- For some tests, this will consist of filming
|
| 3:00p
|
|
B2: Reactive Planner (Cable)
- Modules: list of all modules needed for test
- Team (4): Ryan, Jeff, Rob, Kevin
- Backup slot for Efficient Operations, if needed
|
|
| 6:30p
|
End of Day Meeting
- Go over results of the day; replan as needed
- Define action items for evening
|
| 7:00p
|
Dinner
- Helpers (2): helper1, helper2
|
|
| 7:30p
|
Working time
- Simulation tests (in shop)
|
- Possible run into town for supplies, showers, etc
</table>
Day 2
- Test Attendance Sunday: Ryan C., Chris, Lars, Rob, Ken, Tony, Eric, Laura, Henry?
Goals
- Establish initial operations
- Complete critical objectives
|
Test Manager: Cremean
- Run all meetings (go/no go)
- Maintain (and realign) schedule
- Supervise filming
|
- Team member marked in bold is the task leader
- Team member marked in italics is the default notetaker
</table>
|
|
Top
GOTChA
Prep
Day 1
Day 2
</table>
</table>
| Time | Track 1 | Track 2 | Operations
|
| 7:00a |
- Test manager review of go/no go criteria, plan for the day
|
- Database transfer: (owner)
|
| 8:00a
|
Drive to test area
- Alice (4): Grogan, passengers
- Tow vehicle (2): Driver, passengers
-
Suburban (5): Driver, passengers
- Harvey (6): Driver, passengers [leaves 30 minutes early]
|
</table>
|
| 9:00a
|
A2: Efficient Desert Testing (Wetzel)
- Demonstration of two minute turnaround from failure.
- Identify and document why and in what conditions it failed.
- Isolate and save log files up to failure.
- Restart of all modules and logging.
- Rapid turnaround to continue testing.
- Modules: list of all modules needed for test
- Team (4): Eric, Laura, Chris, Rob
|
B1: Efficient Operations #1 (Cady)
- Demonstrate ability to initiate test from cold start
- Time all operations; multiple attempts to improve times
- Sample task: trashcan avoidance
- Show working remote e-stop
- Modules: list of all modules needed for test
- Team (4): Jason, Chris, Eric, Henry
- Additional comments, notes
- Subversion branches for field testing
|
C2: Filming (Fisher)
C0: Set up operations area (Grogan)
- Set up RVs, tables, networking, power
- Team (6): Owner, team members
|
| 11:00a
|
TrajFollower Calibration + E-Stop (Lindzey)
- Verify operation of TrajFollower at Santa Anita
- Test E-Stop functionality if possible
- Team (4): Laura, Ken, Ben P
|
|
|
| 12:00p |
Lunch
Helpers (2): helper1, helper2
|
| 1:00p
|
|
LadarFeeder/FusionMapper (Grogan)
- making sure ladar accurately fills in map
- Team (4): Chris W, Rob, Ryan, Kevin
- Additional comments, notes: Grogan is not knowledgable in this test, but can coordinate those who are
|
|
| 3:00p
|
Deliberative planner (A3, D Kogan)
- Apply Efficient Operations procedures
- Set up trash cans for obstacle avoidance
- Deliberative planning at 10mph around trash cans
- Modules: adrive, astate, TrajFollower, LadarFeeder, FusionMapper, PlannerModule
- Team (4): Dima, Eric, Ken, Laura
- Additional comments, notes
|
|
|
| 5:00p
|
|
B2: Reactive Planner (Cable)
- Apply Efficient Operations procedures
- Modules: list of all modules needed for test
- Team (4): Ryan, Jeff, Rob, Kevin
- Backup slot for Efficient Operations, if needed
|
|
| 7:00p
|
Pack & Return to Pasadena
|
| 8:00p
|
End of test meeting
|
| 9:00p
|
Unpack
</table>
Additional Notes
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|