Spring W3 Field Test

From DGC Wiki

This page describes the goals and objectives for the Spring W3 Field Test, scheduled to take place on 16-17 April at Stoddard Wells. Instructions for editing this page:


</table>

GOTChA Blockers Schedule Field Notes Spring Test Plan

</tr> </table>


GOTChA Chart

Goals

  • x 10 minute run from cold start
  • P Obstacle avoidance using LADAR, stereo at low speed
  • x Efficient calibration, data logging, and operations
  • ✗ Complete Stoddard Wells loop with sensor-based obstacle avoidance through deliberative planning.

Prep

Day 1

Day 2 </table>

Test Team

  • Cable (pln, doc)
  • Cady (ter, tst)
  • Cremean (IPT)
  • Duncklee (ter, bld)
  • Fisher (veh/emb, ops)
  • Grogan (veh/emb, ops)
  • Kogan (pln)
  • Murray (IPT)
  • Somers (veh/emb, sys)
  • Wetzel (pln, mod)

</table>

Objectives

Critical:
  • ✔ Demonstrate functionality for remote starting and stopping of modules (B1)
  • P Simulate spring field test operation using automated module startup (on small RDDF) (S1)
  • P Develop specifications for unified data logging and playback (A0)
  • x Define process for stable branch checkin/checkout (C0)
  • P Figure out solution for long-range radio (B0)
Baseline:
  • x Mock site visit; trash can Obstacle avoidance at 10 mph with 10 minute setup (repeated 10 times) (B1)
  • ✔ Gazebo simulation prior to departure (S1)
  • x Develop efficient calibration procedures: ≤30 minutes for each of LADAR, stereo intrinsic, stereo extrinsic (A1)
  • P Enable playback/unified data logging of raw data (A0)
  • x E-stop demonstration (w/ safety driver) (B1)
    • Electronic signalling of pause/run/disable
    • Software-based pause using skynet message
    • Warning lights and tone installed and operational (to be moved to W6)
  • ✔ Install front seat harnesses (done by Ken et. al)
  • P Finalize specifications for DBS and reactive planner (B2)
  • ✗ Two (2) minute turnaround from failure of one part of test to continuation of test. (A2)
    • Identification and documentation of failure mode and conditions.
    • Isolation of logs for that part of test.
    • Back in autonomous mode within two minutes.

Bonus
  • P Test reactive planner implementation in place of deliberative planner (B2)
  • x Stereovision obstacle avoidance (A2)
  • x Test integrated reactive and deliberative planner with mode management (B2) (not until each have been sufficiently tested)
  • At least one run without safety driver (A2, B2) (not until Estop sufficiently tested)

</table>

Technical Challenges (blockers)

  • Strike out when resolved
  1. Get FusionMapper and Planner working together across UDP (Dima)
  2. Get LadarFeeder and FusionMapper working together in Gazebo (Chris W)
  3. Get ModuleStart working and demonstrated on Alice/Gazebo (Henry)
  4. Get Logger working in at least a few modules (Henry)
  5. Checklists for Alice operations (Laura)

  1. Design specific tests and assign test team owners for them (W3 test) (done)
  2. Assign operation teams for tests ASAP (W3 test) (done)
  3. Determine if DARPA will allow safety driver in site visit (IPT) (yes)
  4. Implement "failsafe" E-stop operation (IPT) (move to W6)
  5. Pick color of trashcans for site visit (Terrain) (done by E Cady)
  6. Look into time of day and sun location issues for site visit (Terrain) (move to W6)
  7. Grow obstacles and RDDF in cost map (Terrain) (done in path evaluation for W3, need to test)
  8. Executables installed to one location (Build, bug #1414)
  9. Remote module starting/stopping (Planning, bug #1368, bug #1430)
  10. Implementation of unified logging (Planning, bug #1256)
  11. Fix front hub and differential (Vehicle, bug #1420, bug #1421)
  12. Develop and document new calibration procedure (Terrain, bug #1259)
  13. Check the links below for more!
Bugzilla blockers for Spring W3 field test]

Approach (timeline)

Mo 4/4 12:00p Test team meeting to agree on goals and objectives
Tu 4/5 12:00p Review test goals at project meeting
Mo 4/11 7:00p Test team meeting to review and modify plan
Tu 4/12 12:00p Test team presentation at project meeting (objectives, schedule, blockers)
We 4/13 7:00p Test team meeting (shop) - check on status
Th 4/14 5:00p Test status meeting - go over test status; determine actions + time of go/no-go meeting
Sa 4/16 7:00a Go/no-go meeting - verify ready to go
Sa 4/16 Test day #1
  • Setup base camp, operations
  • Demonstrate critical and baseline objectives
  • Debugging in shop
  • End of day meeting @ 76:30 pm (in field)
Su 4/17 7:00a Go/no-go meeting - verify ready to go
Su 4/17 Test day #2
  • Demonstrate critical and baseline and bonus objectives
  • Return to PasadenaCaltech by ~8 pm
Su 4/17 8:00p Test review (all test participants; restaurant)

</table>

</table>

Test Schedule

Prior to Go/No-Go Meeting

For checkout purposes, last stable build: <insert revision # here> (Duncklee)
  • Equipment preparation (Cady)
    • List any unusual items that need to be taken
  • S1: Simulation of all tests on Gazebo (Wetzel)
    • Should include logging

Top
GOTChA
Prep
Day 1
Day 2
</table> </table>

Specific tests to run before leaving shop

  • A0: Data logging and playback specs (Somers)
  • B0: Long range radio testing (Grogan)
  • C0: Subversion stable branch process setup (Duncklee)
  • A1: Calibration Process (Duncklee)
    • Demonstrate ability to efficienly calibrate stereo, LADAR

Day 1

  • Test Attendance Saturday: Lars, Ryan C., Chris, Jason, Alex, Rob, Ken, Tony, Jeff, Eric, Laura
Goals
  • Establish initial operations
  • Complete critical objectives
Test Manager: Murray
  • Run all meetings (go/no go)
  • Maintain (and realign) schedule
  • Supervise filming
  • Team member marked in bold is the task leader
  • Team member marked in italics is the default notetaker

</table>

Top
GOTChA
Prep
Day 1
Day 2
</table> </table>

TimeTrack 1Track 2Operations
7:00a
Go/No-Go Meeting
  • Go through pre-conditions and make sure we are ready to leave

 
  • Transfer databases to lawrencium (Owner)

8:00a

Drive to test area
  • Alice (4): Grogan, passengers
  • Tow vehicle (2): Driver, passengers
  • Suburban (5): Driver, passengers
  • Harvey (6): Driver, passengers [leaves 30 minutes early]
  • Additional cars:
    • Driver (#): passengers
  • Directions to [[<Name> Test Area]]

</table> </s>

9:00a

B1: Efficient Operations #1 (Cady)
  • Demonstrate ability to initiate test from cold start
  • Time all operations; multiple attempts to improve times
  • Sample task: trashcan avoidance
  • Show working remote e-stop
  • Modules: list of all modules needed for test
  • Team (4): Jason, Chris, Ben, Eric
  • Additional comments, notes
  • Subversion branches for field testing

 

C0: Set up operations area (Grogan)
  • Set up RVs, tables, networking, power
  • Team (6): Owner, team members

11:00am
 

LadarFeeder/FusionMapper (Grogan)
  • making sure ladar accurately fills in map
  • Team (4): Dima, Kevin, Rob, Ryan
  • Additional comments, notes: Grogan is not knowledgable in this test, but can coordinate those who are

Lunch

Helpers (2): helper1, helper2

1:00p

Deliberative planner (A3, D Kogan)
  • ModuleStarter capability from B1 continued
  • Set up and commit new RDDFs
  • Set up trash cans for obstacle avoidance
  • Deliberative planning at 10mph around trash cans
  • Modules: adrive, astate, TrajFollower, LadarFeeder, FusionMapper, PlannerModule
  • Team (4): Dima, Eric, Ken, Alex
  • Additional comments, notes

 
  • Transfer and document logs

C1: Auxilliary Activities
  • Make use of other vehicles, as needed
  • For some tests, this will consist of filming

3:00p
 

B2: Reactive Planner (Cable)
  • Modules: list of all modules needed for test
  • Team (4): Ryan, Jeff, Rob, Kevin
  • Backup slot for Efficient Operations, if needed

 
6:30p
End of Day Meeting
  • Go over results of the day; replan as needed
  • Define action items for evening
7:00p
Dinner
  • Helpers (2): helper1, helper2

 
  • Shuttle: Driver

7:30p
Working time
  • Simulation tests (in shop)

 
  • Possible run into town for supplies, showers, etc

</table>

Day 2

  • Test Attendance Sunday: Ryan C., Chris, Lars, Rob, Ken, Tony, Eric, Laura, Henry?
Goals
  • Establish initial operations
  • Complete critical objectives
Test Manager: Cremean
  • Run all meetings (go/no go)
  • Maintain (and realign) schedule
  • Supervise filming
  • Team member marked in bold is the task leader
  • Team member marked in italics is the default notetaker

</table>

Top
GOTChA
Prep
Day 1
Day 2
</table> </table>

TimeTrack 1Track 2Operations
7:00a
Go/No Go Meeting
  • Test manager review of go/no go criteria, plan for the day
 
  • Database transfer: (owner)
8:00a
Drive to test area
  • Alice (4): Grogan, passengers
  • Tow vehicle (2): Driver, passengers
  • Suburban (5): Driver, passengers
  • Harvey (6): Driver, passengers [leaves 30 minutes early]
  • Additional cars:
    • Driver (#): passengers
  • Directions to Santa Anita

</table>

9:00a

A2: Efficient Desert Testing (Wetzel)

  • Demonstration of two minute turnaround from failure.
    • Identify and document why and in what conditions it failed.
    • Isolate and save log files up to failure.
    • Restart of all modules and logging.
    • Rapid turnaround to continue testing.

  • Modules: list of all modules needed for test
  • Team (4): Eric, Laura, Chris, Rob

B1: Efficient Operations #1 (Cady)
  • Demonstrate ability to initiate test from cold start
  • Time all operations; multiple attempts to improve times
  • Sample task: trashcan avoidance
  • Show working remote e-stop
  • Modules: list of all modules needed for test
  • Team (4): Jason, Chris, Eric, Henry
  • Additional comments, notes
  • Subversion branches for field testing

C2: Filming (Fisher)
  • Film A2 and B2 tests

C0: Set up operations area (Grogan)
  • Set up RVs, tables, networking, power
  • Team (6): Owner, team members
11:00a
TrajFollower Calibration + E-Stop (Lindzey)
  • Verify operation of TrajFollower at Santa Anita
  • Test E-Stop functionality if possible
  • Team (4): Laura, Ken, Ben P
 
 
12:00p
Lunch

Helpers (2): helper1, helper2

1:00p
 
LadarFeeder/FusionMapper (Grogan)
  • making sure ladar accurately fills in map
  • Team (4): Chris W, Rob, Ryan, Kevin
  • Additional comments, notes: Grogan is not knowledgable in this test, but can coordinate those who are
 
3:00p
Deliberative planner (A3, D Kogan)
  • Apply Efficient Operations procedures
  • Set up trash cans for obstacle avoidance
  • Deliberative planning at 10mph around trash cans
  • Modules: adrive, astate, TrajFollower, LadarFeeder, FusionMapper, PlannerModule
  • Team (4): Dima, Eric, Ken, Laura
  • Additional comments, notes
 
 
5:00p
 
B2: Reactive Planner (Cable)
  • Apply Efficient Operations procedures
  • Modules: list of all modules needed for test
  • Team (4): Ryan, Jeff, Rob, Kevin
  • Backup slot for Efficient Operations, if needed
7:00p
Pack & Return to Pasadena
8:00p
End of test meeting
  • including dinner
9:00p
Unpack

</table>

Additional Notes


Retrieved from "http://kincora.cds.caltech.edu../../../s/p/r/Spring_W3_Field_Test_9288.html"

This page has been accessed 567 times. This page was last modified 06:40, 19 April 2005 by Richard Murray. Based on work by Ryan Cable and Robert Grogan and DGC Wiki user(s) Cady, Lars and Duncklee.


[Main Page]
Main Page
Alice Docs
DGC07
DGC05
Categories
Recent changes
Help

Edit this page
Discuss this page
Page history
What links here
Related changes

Special pages
Bug reports