GOTChA Chart
Goals
- P Demonstrate planning based on integrated road following [Did several miles of following road trajectories; not map-based planning]
- ✔ Demonstrate planning based on integrated static data (GPS traces) [Proof-of-concept demonstrated for short sections]
- P Demonstrate complete system architecture (including deliberative/reactive (separately),
modeman, GPSFinder, roadFinder, ladar/stereo) with occasional obstacles [Tested deliberative and reactive with ladar in Gazebo; stereovision was not able to be calibrated; state and map issues prevented significant integrated testing]
- X Enable offline testing and module characterization with logged and simulated data playback in modules [not yet ready]
|
Prep
|
Day 1
|
Day 2
</table>
|
- Pfister (IPT)
- Foote (veh/emb, bld)
- Hines (veh/emb, tst)
- Pollack (veh/emb, ops)
- Stewart (pln, doc)
|
- Craig (pln, doc)
- Yosinski (pln, test)
- Soudek (ter, mod)
- Heyneman (ter, mod)
- Feingold (ter)
- Sexson (veh/emb)
| |
</table>
|
Objectives
Critical:
- ✔ E-stop fully operational & software failsafe (Tully)
- X Centralized and unified capability to log all sensor data (hardware limited) (Jason)
- X Capability to play back logged and simulated data with repeatable results (Jason)
- X Deliberative planner perfoming obstacle avoidance at 20 mph (Jason)
ModeMan able to slow trajectory to zero and keep it there (Alex)
- ? Reactive Planner able to obey same continuity constraints as deliberative planner (Alex)
- X Planning with static data feeding seeds (Dan)
- ✔ Road following operational (unit test & integration) (Dan)
|
Baseline:
- X Ladars, Riegl operational (interfaced) (George)
-
Installation & demo of new steering motor (Ben)
-
Installation of steering motor gearbox & new steering motor driver interface (Ben)
-
Transmission/transfer case & ignition actuation (Harmon)
-
Demo of gimbal platform to evaluate gimbal performance
- ✔ Static data required for all of intended testing area (Dan)
-
Mount, interface and test Riegl and second Sick Ladar (George)
-
High-speed driving (>20 mph)
- X Minimize AState IMU drift (able to run without GPS with some TBD performance spec) (Tully)
|
Bonus
- X 50 miles of autonomous driving with complete architecture and occasional obstacles
- X Full course completed without stops in Gazebo
</table>
|
Technical Challenges (blockers)
AState
- Characterize angular drift (W9)
- need to be able to run X>0 time w/o GPS with
- less than Y rad/sec drift
- less than Z mm/sec drift
- Raw data playback on time cue from logger module
ADrive
-
transmission interface
- new steering motor interface
Road Finding
- get code working in our repository (Bug #1445)
- output angle to vanishing point (W9)
- filling in fusion mapper (Bug #803)
TrajFollower
- Fix feedforward constants (W8) (bug #1258)
- Lateral error < 30cm on dirt at 20mph
Planner
- doesn't slow to a halt fast enough
- clean up obstacle grower
ModeMan
- fix traj checking
- fix trajectory slowdown (W9)
- test with reactive and planner together, with one traj evaluation function, always sending the best traj to follower
Reactive Planner
- Test on Alice during W9 with planner/modeman
GPS Finding / Static Mapping
- GPS finding providing a seed for the planner
Fusion Mapper
- implement non-binary obstacles (bug #1707, bug #1706)
- fuse multiple data sources into elevation layer
- fuse multiple cost layers (road, terrain, RDDF, GPS) into combined cost
- test and benchmark alternative map resolutions
-
remove obstacle grower
- Add option to mapper to grow obstacles in the combined cost layer (bug #1262)
Data Logging
- raw data and skynet message logging
- playback of skynet messages
- raw data playback in appropriate modules
Gazebo
- HOWTO document for Gazebo
- solve simulated state issues
- Riegl mounted
Ladar
- increase speed from 7Hz to 75Hz (bug #793, bug #1639)
- Raw data playback on time cue from logger module (or from state playback?)
Vehicle
Embedded
- validate guaranteed packet functionality (bug #1363)
Ops
- get Harvey ready to go
-
wireless bridge for chase vehicle
Bugzilla Links
Bugzilla blockers for Spring W9+W10 field test]
All Bugzilla tasks for Spring W9+W10 field test]
Bugzilla blockers for Spring W9 field test]
Bugzilla blockers for Spring W10 field test]
|
Approach (timeline)
| Mo 5/16 | 5:00p
| Test team meeting to agree on goals and objectives
| | Tu 5/19 | 12:00p
| Test team meeting Finalize goals and objectives
| | Tu 5/24 | 12:00p
| Review test goals at project meeting
| | Tu 5/24 | 1:00p
| Test team meeting - Update blockers / bugzilla for W10, Finalize plan for W9
| | Tu 5/31 | 1:00p
| Test team meeting - check on status
| | Th 6/02 | 5:00p
| Test status meeting - go over test status; determine actions + time of go/no-go meeting
| | Sa 6/04 | 7:00a
| Go/no-go meeting - verify ready to go
| | Sa 6/04 |
| Test day #1
- Setup base camp, operations
- Demonstrate critical and baseline objectives
- End of day meeting @ 7pm (in field)
| | Su 6/05 |
| Test day #2
- Demonstrate baseline and bonus objectives
- Return to Pasadena by ~8 pm
| | Su 6/05 | 8:00p
| Test review (all test participants; restaurant)
</table>
</table>
Test Schedule
Prior to Go/No-Go Meeting
For checkout purposes, last stable build: <insert revision # here> (Tully)
|
|
- Equipment preparation (TBD)
- List any unusual items that need to be taken
- Simulation of all tests on Gazebo (TBD)
|
|
Top
GOTChA
Prep
Day 1
Day 2
</table>
</table>
Specific tests to run before leaving shop
Day 1
- Test Attendance Saturday:
- Veh/Emb : Sam, Jeff, Tully
- Planning : Lars, Chris W., Adam C., Jason
- Terrain : Ryan F, Dan, Jeremy L, Jeremy G
Goals
- Establish initial operations
- Complete critical objectives
|
Test Manager: Pfister
- Run all meetings (go/no go)
- Maintain (and realign) schedule
|
- Team member marked in bold is the task leader
- Team member marked in italics is the default notetaker
</table>
|
|
Top
GOTChA
Prep
Day 1
Day 2
</table>
</table>
| Time | Track 1 | Track 2 | Operations
|
| 7:00a |
- Go through pre-conditions and make sure we are ready to leave
|
- Transfer databases to lawrencium (Owner)
|
| 8:00a
|
Drive to test area
- Sam, Jeff, Tully, Lars, Chris W.,
Adam C., Jason, Ryan F, Dan, Jeremy L, Jeremy G
- Alice (4): Driver, passengers
- Tow vehicle (2): Driver, passengers
- Harvey (6): Driver, passengers
|
- Additional cars:
- Jeff's truck (2) Jeff, passengers
- Tully's car (3) Tully, passengers
- Directions to [[<Name> Test Area]]
</table>
|
| 10:00a
|
A1: astate, adrive (Tully)
- Use w10_testing branch
- Speed : as needed
- Distance : as needed
- Modules : astate adrive trajfollower GUI
- Team : Tully, Jeremy L, Jeremy G., Dan
- Results :Notes A1
- Unknown problem with Astate or SDS
- Successful verification of adrive modifications
|
B1: Road Follower #1 (Dan)
* Pushed to 11:30. Issue with Dan and Ryan building with old version of Chris R's code
- Test road following on straight/slight-curved roads
- Target of about 1 mile of straight/slight-curved roads in various lighting conditions
- Viewable real time vanishing point info
- Logging of road vanishing point and image data
- Team : Tully, Ryan F, Dan, Christopher R.
- Results :Notes B1
- Successful road tracking
- Astate lost gps link and diverged
|
C1: Set up operations area (owner)
- Set up RV, tables, networking, power
- Team : Owner, team members
|
| 11:00a
|
Stereo cameras out of calibration from drive up
A2: Fusion mapper test #1 (Jeremy G)
- Use w10_testing branch with ladar feeder on to evaluate spurious data
- stereo off to start
- add stereoFeeder as allowable by road following tests
- Speed : 10-15mph
- Distance : about 1 mile
- Modules : astate adrive trajfollower fusionMapper plannerModule ladarFeeder stereoFeeder GUI
- Team :
A2: AState diagnostics (Jeremy L.)
- Roll back Astate to w6stable
- Results :Notes A2
|
Lunch
Helpers (2): helper1, helper2
|
| 12:00a
|
|
|
| 1:00p
|
|
B2: Road Follower #2 (Dan)
Push the turn characterization til tomorrow. Instead focus on controlling Alice on straight stretches from road detector
- Road Follower specific driving
- Test road following characterization entering and leaving hard turns
- Characterize detection failure and reaquire
- Viewable real time vanishing point info
- Logging of road vanishing point and image data
- Team :
- Results :Notes B2
- .7 miles fully autonomous road following
- biased to right side of road
- Stopped by astate issues
|
C2: Scout alternate sites (owner)
- Only if there's an available vehicle
- Vehicle :
- Team :
|
| 2:00p
|
A3: Fusion mapper test #3 (Jeremy G.) Out at 4:30 with obstacle grower working
- Use w10_testing branch with ladar feeder on to evaluate spurious data performance
- stereo on if A4 results are good and ok with road following tests
- Speed 5,10,15,20 mph
- Distance : 10 miles total
- Modules : astate adrive trajfollower fusionMapper plannerModule ladarFeeder (stereoFeeder) GUI
- Team :
- Results :Notes A3
- Removed obstacle growing code (memory leak)
- Successful evaluation of non binary map with minimal spurious data. Failed to reach 10 miles due to planner failure (later corrected : map resolution mismatch)
|
|
3:00p
|
fusionmapper code not ready for road following interface. Try to get Joe out to help. (UPDATE: didn't happen)
B3: Road Follower #3 (Dan)
- Road following interface test
- Demonstrate merging of road following data into cost-map
- Viewable cost-map layer
- Logging of cost-map and image data
- Team :
|
|
| 5:00p
|
No time to perform, A3 ran til 7:15
A4: Aggressiveness tuning demonstration in fusionMapper (Jeremy G.)
- Test online tuning of elevation gradient to speed
- Test online scaling of RDDF speed
- Use w10_testing branch
- Speed : 5, 10, 15mph
- Distance : 1 mile
- Modules : astate adrive trajfollower fusionMapper plannerModule ladarFeeder/stereoFeeder GUI
- Team :
|
|
|
| 6:30p
|
End of Day Meeting
- Go over results of the day; replan as needed
- Define action items for evening
Departures
- Vehicles : Tully's car (3), Jeff's truck (2), Tow vehicle (2-3)
- Jeff, Tully, Adam, Chris W, Jeremy G, Jason, Jeremy L, Jason?
|
| 7:00p
|
Dinner
- Helpers (2): helper1, helper2
|
|
| Evening
|
Arrivals
- Vehicles : Ben's car (3), Tow vehicle (2)
- George, Ben, Alex,
Ryan C., Eric
- Some miscommunication : Ryan wasn't there
Working time
Ryan not here so instead collect static data, get gas
- A5: Reactive Planner #1 (Alex)
- Initial test of reactive planner
- Gather as much information as possible for overnight/morning debugging
- Team : Ryan C.
|
|
- Possible run into town for supplies, showers, etc
</table>
Day 2
- Test Attendance Sunday:
- Veh/Emb : Sam, George, Ben
- Planning : Lars, Ryan C, Alex, Jason?
- Terrain : Ryan F, Dan, Eric
Goals
- Complete baseline and bonus objectives
|
Test Manager: TBD
- Run all meetings (go/no go)
- Maintain (and realign) schedule
- Supervise filming
|
- Team member marked in bold is the task leader
- Team member marked in italics is the default notetaker
</table>
|
|
Top
GOTChA
Prep
Day 1
Day 2
</table>
</table>
| Time | Track 1 | Track 2 | Operations
|
| 8:00a 9:00a
|
Static data not quite ready so do further Astate diagnosis and fusionMapper testing
A6: Astate and non-binary fusion mapper test (Alex)
A6: Static Data #1 (Alex)
- Test planning based on static data filling in map
- Use w10_testing branch
- Speed : 5-20mph
- Distance : 5 miles
- Modules : astate adrive trajfollower fusionMapper plannerModule GPSfinding GUI
- Team : Eric C.
|
|
C3: Scout alternate sites (George)
Not enough manpower for actual scouting but reviewed details of sites with Tony
- Only if there's an available vehicle
- Vehicle :
- Team :
|
| 10:00a 11:00a
|
Scratch - no Ryan C.
A7: Reactive Planner #2 (Alex)
- Test reactive planner
- Use w10_testing branch
- Speed : 5-15 mph
- Distance : about 1 mile
- Modules : astate adrive trajfollower fusionMapper reactivePlanner ladarFeeder GUI
- Team : Ryan C.
|
B4: Road Follower #4 (Dan)
- Further testing of Cristopher R's code integration
- Results :Notes B4
|
|
| 1:00p
|
A8: Static Data #2 (Alex)
- Test planning based on static data filling in map and sensor data
- Use w10_testing branch
- Speed : 5-20mph
- Distance : about 1 mile
- Modules : astate adrive trajfollower fusionMapper plannerModule ladarFeeder/stereoFeeder GPSfinding GUI
- Team : Eric C.
|
|
Lunch
Helpers (2): helper1, helper2
|
| 3:00p4:00p
|
A7: Deliberative Planner (Alex)
- Test deliberative planner
- Use w10_testing branch
- Speed : 5-15 mph
- Distance : about 1 mile
- Modules : astate adrive trajfollower fusionMapper deliberativePlanner ladarFeeder GUI
- Team : Alex
- Results :Notes A7
A9: Planning based on road following (Dan)
- Test planning based on static data filling in map
- Use w10_testing branch
- Speed : 5-10mph
- Distance : 1 miles
- Modules : astate adrive trajfollower fusionMapper plannerModule roadfinding GUI
- Team :
|
|
|
| 5:00p
|
A8: Static Data #1 (Alex)
- Test planning based on static data filling in map and sensor data
- Use w10_testing branch
- Speed : 5-20mph
- Distance : about 1 mile
- Modules : astate adrive trajfollower fusionMapper plannerModule ladarFeeder/stereoFeeder GPSfinding GUI
- Team : Eric C.
A9: Planning based on road following (Dan)
- Test planning based on static data filling in map
- Use w10_testing branch
- Speed : 5-10mph
- Distance : 1 miles
- Modules : astate adrive trajfollower fusionMapper plannerModule roadfinding GUI
- Team :
|
Static Data on Alice
|
|
| 7:00p
|
Pack & Return to Pasadena
|
| 8:00p
|
End of test meeting
|
| 9:00p
|
Unpack
</table>
Additional Notes
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|