Main Page | Recent changes | Edit this page | Page history

Printable version | Disclaimers | Privacy policy

Not logged in
Log in | Help
 

Project Race Teams

From DGC Wiki

Main GOTChA Timeline [W15] Test Plan [W15]   300 mi, 35 mph 0B, 0N
    Org Chart Race Teams System Spec Test Matrix NQE   GCE
Teams IPT Veh/Emb Planning Terrain Add'l Teams

Team Caltech is divided into three race teams: vehicle/embedded systems, planning and terrain. It is important for these teams to have clearly defined and understood scopes and interfaces, so these are officially kept on this page for all teams. Feel free to add more details to this page.

Links to team pages

Project Vehicle/Embedded Planning Terrain

</tr>

GOTChA Chart
Fall 04
Winter 05
Spring 05

Summer 05

Fall 04
Winter 05
Fall 04
Winter 05
Spring 05

Summer 05 </table>

Fall 04
Winter 05
Spring 05

Summer 05

Fall 04
Winter 05
Spring 05

Summer 05 </tr>

Team Status Chart
5 Jul 05
Enlarge
5 Jul 05
22 Aug 05
Enlarge
22 Aug 05

see also Planning Status Chart

21 Jul 05
Enlarge
21 Jul 05

see also Terrain Status Chart </tr>

Team Specifications
System Spec Vehicles Spec Embedded Spec Planning Spec Terrain Spec

</tr> </table>

Race Team Scope

Veh/Emb Team Scope
  1. Maintenance of vehicles (moved to Ops)
  2. Shop and field testing infrastructure (moved to Ops)
  3. Onboard vehicle power delivery
  4. Onboard climate control (e.g. humidity, temperature)
  5. Selection and installation of actuators
  6. Mounting of sensors/gimbal platform
  7. Mounting and isolation of computers and peripherals
  8. Computing software infrastructure (module management, messaging) (moved to Planning)
  9. User interface (framework): telemetry, module control, graphical interface (e.g. for visualizing paths, map layers, vehicle state) (moved to Planning)
  10. E-stop integration (pause/resume sent to Planning; disable to hardware)
  11. Race computing hardware infrastructure (computers, KVM, networks)
  12. Take steering and acceleration commands from Executive Follower (Planning)
  13. Actuation (throttle, brake, steering, transmission) to achieve commanded steering and acceleration
  14. OBD II integration

Notes: Embedded Task Force 2004-07-14

Planning Team Scope
  1. Maintenance of RDDF code and supporting functions
  2. Real-time map display (plugin for user interface)
  3. Deliberative framework
    • Take in elevation maps created by terrain team
    • Cost map calculation based on elevation maps and RDDF
    • Path planning through cost map (probably multiple; special case: arc or heading)
  4. Cost evaluation of precomputed paths through cost map.
  5. Executive Layer
    • Mode-management: Deciding best path given input paths from various sources. Handling E-stop pause and resume commands. Deciding maximum speed for given situation.
    • Path-following (trajectory control) and maintenance of path code.
    • Sending acceleration and steering (or steering rate) commands to Embedded.
  6. Simulation: Tools for testing planning software (moved to Modeling Team)
  7. Modeling: Maintenance of list of vehicle models for various purposes (moved to Modeling Team)
  8. Computing software infrastructure (module management, messaging) (moved from V/E)
  9. User interface (framework): telemetry, module control, graphical interface (e.g. for visualizing paths, map layers, vehicle state) (moved from V/E)


Notes: Planning Meeting Notes 2004-10-06

Terrain Team Scope
  1. State acquision and filtering (includes state server; interfacing to hardware: IMU, DGPS, magnetometer; defining state variables and structures)
  2. Synchronization of state data with range images.
  3. Delivering accurate and timely elevation maps (e.g. based on LADAR, stereovision)
  4. Sensors choice, placement and coverage.
  5. Static data acquisition and processing (including GPS traces); collaborative effort with Vehicles team
  6. Camera-based road following algorithms and integration (up to sending desired vehicle path or updating cost map layer).
  7. LADAR-based road-following algorithms and integration (up to sending desired vehicle path or updating cost map layer).
  8. Gimballed sensor platform pointing

Notes: Terrain Meeting Notes 2004-10-07 </table>

Cross-team delegates

  • This section should indicate the current cross-team delegates from and to each of the project teams. These roles may rotate, but names should be kept current here so that teams know who to contact about interface issues, etc.

From, To Veh/Emb Planning Terrain IPT
Veh/Emb Tully F Tully F, Jeff L
Planning Henry B, Laura L Ryan C Alex S
Terrain Jeremy L Jeremy G Jeremy G
IPT Sam P Lars C Kristo K

</table> </center>

Race Team Roster

Retrieved from "http://kincora.cds.caltech.edu../../../p/r/o/Project_Race_Teams_2e66.html"

This page has been accessed 1,489 times. This page was last modified 23:05, 22 August 2005 by DGC Wiki user Lars. Based on work by Richard Murray, Sam Pfister, Ryan Cable, Robert Grogan and Henry Barnor and DGC Wiki user(s) Klk, Astewart, Foote, Jlamb, Hines, Somers, Elliotta, Davidc, Pickett, Jeremy, Kenneth, Jason, Sueh and Ben.


[Main Page]
Main Page
Alice Docs
DGC07
DGC05
Categories
Recent changes
Help

Edit this page
Discuss this page
Page history
What links here
Related changes

Special pages
Bug reports