Maintenance of vehicles (moved to Ops)
-
Shop and field testing infrastructure (moved to Ops)
- Onboard vehicle power delivery
- Onboard climate control (e.g. humidity, temperature)
- Selection and installation of actuators
- Mounting of sensors/gimbal platform
- Mounting and isolation of computers and peripherals
-
Computing software infrastructure (module management, messaging) (moved to Planning)
-
User interface (framework): telemetry, module control, graphical interface (e.g. for visualizing paths, map layers, vehicle state) (moved to Planning)
- E-stop integration (pause/resume sent to Planning; disable to hardware)
- Race computing hardware infrastructure (computers, KVM, networks)
- Take steering and acceleration commands from
Executive Follower (Planning)
- Actuation (throttle, brake, steering, transmission) to achieve commanded steering and acceleration
- OBD II integration
Notes: Embedded Task Force 2004-07-14
|
- Maintenance of RDDF code and supporting functions
- Real-time map display (plugin for user interface)
- Deliberative framework
- Take in elevation maps created by terrain team
- Cost map calculation based on elevation maps and RDDF
- Path planning through cost map (probably multiple; special case: arc or heading)
- Cost evaluation of precomputed paths through cost map.
- Executive Layer
- Mode-management: Deciding best path given input paths from various sources. Handling E-stop pause and resume commands. Deciding maximum speed for given situation.
- Path-following (trajectory control) and maintenance of path code.
- Sending acceleration and steering (or steering rate) commands to Embedded.
-
Simulation: Tools for testing planning software (moved to Modeling Team)
-
Modeling: Maintenance of list of vehicle models for various purposes (moved to Modeling Team)
- Computing software infrastructure (module management, messaging) (moved from V/E)
- User interface (framework): telemetry, module control, graphical interface (e.g. for visualizing paths, map layers, vehicle state) (moved from V/E)
Notes: Planning Meeting Notes 2004-10-06
|
- State acquision and filtering (includes state server; interfacing to hardware: IMU, DGPS, magnetometer; defining state variables and structures)
- Synchronization of state data with range images.
- Delivering accurate and timely elevation maps (e.g. based on LADAR, stereovision)
- Sensors choice, placement and coverage.
- Static data acquisition and processing (including GPS traces); collaborative effort with Vehicles team
- Camera-based road following algorithms and integration (up to sending desired vehicle path or updating cost map layer).
- LADAR-based road-following algorithms and integration (up to sending desired vehicle path or updating cost map layer).
- Gimballed sensor platform pointing
Notes: Terrain Meeting Notes 2004-10-07
</table>
Cross-team delegates
- This section should indicate the current cross-team delegates from and to each of the project teams. These roles may rotate, but names should be kept current here so that teams know who to contact about interface issues, etc.
|